Moisture testing should be carried out after the commissioning of the ufh system but before any tiles are laid.
Floor screed moisture content before tiling.
Tiling a screed too soon whilst the substrate is still stabilising can result in tiles blowing away from their base heaving as the screed shrinks below.
On average your screed will need around 60 days to cure completely and you should conduct a moisture test before laying your new floor finishes.
This is particularly important if you are working with a concrete subfloor.
A high moisture content can affect the adhesive making the new tiles lose their bond and lift.
What we should know before tiling them october 2017.
Whatever the old flooring is the moisture levels must never exceed a relative humidity of 75.
Tiles should be fixed using a 3mm deep solid layer of adhesive and a minimum 3mm joint should be left between tiles to accommodate movement and for grouting.
Before tiling the area must be fully dry to ensure the adhesive will adhere to the tile and floor screed without issue.
By michael hailwood director laticrete uk.
During this time shrinkage occurs to compensate for the volume loss of water.
Therefore it s advisable to have a floor tested for moisture content prior to installing flooring or moisture barriers.
Typically still dark in colour due to its moisture content.
Before laying onto calcium sulfate screeds it is vital to ensure that the moisture content is at the correct level for the required floor finish.
Moisture testing is carried out using a suitable approved method such as a flooring hygrometer or carbide bomb test.
Moisture testing of the screed where floor tiling is proposed.
There is a resultant slower dissipation of construction moisture in the tiling system so it may be time to rethink this whole issue.
Facebook twitter reddit pinterest whatsapp email link.
Concrete slabs and floors can be excellent subfloor surfaces for tile and other floor coverings but too much moisture in the concrete can cause problems with flooring installations.
How important is it to assess the moisture content of screeds.
The biggest issue that has always been associated with floor screeding is the long drying period that stands as a major hurdle in the early completion of flooring.
The numerical values displayed in the lcd display represent the actual percent moisture content of wood mc and the wood moisture equivalent wme of concrete dry wall and other materials.
Typical values for moisture sensitive floor finishes are less than 0 5 water by weight or less than 75 relative humidity rh for impermeable floors and less than 1 w w for more permeable floors.
For any kind of flooring the final floor finish vinyl tiles wood panelling carpets etc cannot be laid to perfection unless the screed on which it is laid has.