The floor level was 6000mm.
Floor level aod.
In the british isles an ordnance datum or od is a vertical datum used by an ordnance survey as the basis for deriving altitudes on maps a spot height may be expressed as aod for above ordnance datum.
The tag would show 12000 6000 2600 20600mm.
You know when you click on a elevation view and there are levels which are linked to the plan views ie ground floor plan first floor plans etc if my first floor is 2700mm from ground level i want to get it s dimension from the damp proof couse which is 150mm from the ground so my first floor height would.
Flood protection will be provided by the use of flood resistant construction methods for the first metre above floor level.
Extension levels will be the same as the existing house 29 5m aod because it is not practical to raise the extension 0 5m.
Lol ok maybe your right i am not at work at the moment let me try to explain better.
Thinkstock images comstock getty images the impact of the finished floor level is that the difference between the structural floor level and the finished floor level may require the removal of a portion of the bottom of doors.
In 2000 the ordnance survey formally announced that it was abandoning the traditional bms in favour of global positioning systems gps plus a datum conversion model osgm02.
If the aod survey elevation 12000mm.
What i want to do is have the tag reporting the ceiling height above the survey base point.
New search features acronym blog free tools.
In great britain od for the ordnance survey is odn ordnance datum newlyn defined as the msl at newlyn in cornwall between.
300 millimetres mm above the general ground level of the site.
Outside the sfha and in zone b.
The estimated wave crest level during hurricane ike solid line was 3 to 4 above the bfe at this location.
And the underside of the ceiling was 2600mm.
Existing floor levels are 29 5m aod.
Aod stands for above ordnance datum height relative to the average sea level at newlyn cornwall uk.
Aod is defined as above ordnance datum height relative to the average sea level at newlyn cornwall uk frequently.
I need to find out the above ordnance datum aod of an address or postcode i need to give the answer in metres but i can convert any format to metres so thats not a issue.
Is there a website that will do this.
Bolivar peninsula texas v zone house constructed with the lowest floor bottom of floor beam at the bfe dashed line.
The flood level was approximately 4 above the closest bfe.
It is straight forward to have a ceiling tag reporting the height above level.
Finished floor level or ffl is the height of the floor and flooring materials.