Sleeper joists are wooden boards installed on top of an existing subfloor that are typically used as support for hardwood flooring.
Floor joist over concrete.
In most cases.
Then install 24 x 1 1 2 foam between the 2x4 s.
Set up a sleeper system.
Going the opposite direction of the pt on the concrete.
But it can be covered up and this article will show you how.
Building regulations contain specific requirements for framed floors and you should consult your local planning department before beginning this project.
The sleeper joists follow the same arrangement and spacing as the main home joists located under the subfloor.
Floor joists over concrete slab.
Luckily we ve got some great outdoor flooring ideas over concrete starting with building a deck.
Building a framed wood floor over an existing concrete slab can provide the space needed for electric wiring heat venting plumbing drain lines and added insulation when remodeling a basement or garage space.
In this vid we look at the batte.
In this guide we ll provide you with basic instructions to help install a composite deck over concrete.
Hopefully you guys can help me with a project i have in the works or at least on the drawing board if you will.
Been getting a lot of wonderful information around here lately.
Yyyyeeeehaaawww we have just hit over 100 000 views on this vid.
However they just left the concrete for the floor so there are two steps down.
The procedure for installing a floor structure over a slab with 2 by 6 joists can be adapted to larger joist sizes if more subfloor space is required.
When i do this i will only have about 7 or 8 inches between the concrete.
Then lay 6 mil poly over it and staple it down.
To install a composite deck over concrete you re going to need a sleeper system.
A slab with this much damage can t be fixed.
What i want to do is frame a floor over the concrete that is level with the house floor.
The procedure for installing a floor structure over a slab with 2 by 6 joists can be.
So happy its been of use to soooo many folks out there.
A sleeper system is a substructure made up of joists that sits on the surface of the concrete below the decking.
Lay another 2x4 plate around the perimeter and like make said again at 4 5 o c.
Over them going the direction of the pt on the concrete 16 o c.
However because the subfloor may have dips or.